Room dimensions & tours

Women′s halls

  • Christy Suites
  • Christy Suites is under construction and will be completed by the fall of 2024. The suites will feature two 2-person rooms joined by a shared bathroom. The furniture will include modular beds, desks and dressers that can be arranged in various combinations. Lofts are not allowed. Walls will be sheetrock, floors will be carpeted and the building will be air-conditioned.
  • Exterior photo
  • Dimensions and layout
  • Atrium lobby photo
  • Study alcoves photo

 

Men's halls

  • Smith Hall
  • Previously a women’s dorm, Smith will house men beginning in the fall of 2024. Smith rooms come with stackable furniture (beds, dressers and shelves) that allow for creative and original room design. Lofts are not allowed. Walls are cinder block and floors are carpeted. Rooms on the east wing are air-conditioned; those on the west wing are not.
  • Exterior photo
  • Dimensions and layout
loading
LOADING …